urban planner | educator | maker
js6676@columbia.edu
cv  


projects
urban planningurban technologytransportation
climate
urban design
master’s thesis



blog 
about 





















© Jui Shih, 2023 - 2026




Blog About Climate, Environment, Sustainability, and Infrastructure! 


Welcome to the page where I write about interesting observations of what cities and communites are doing to adapt to climate change, brilliant innovative ideas, or my own ideation process.  It’s a blog so anything goes!
Climate Adaptations in NYC:
Brooklyn Bridge Park

Walking through almost jungle like lusciously green park that connects from... May 6, 2026 Climate Adaptations in NYC: East Side Resiliency Project
I took a walk along the East river around East 20th street to check out the controversial capital project known as the “East Side Coastal Resiliency Project”. To be specific, it’s a 2.4 mile long storm resilient system of raised park land, floodwalls, and movable flood gates that are installed along the interior edge of the park, clearly with the goal of forming a continuous protection. At the edge of each section, one can see markers etched into the concrete showing elevation measurements from 8 to 15 feet, providing a reference point for how high surge water could rise. In addition to the barriers is a layered system of water retention stormwater management in the form of rain gardens and planted beds installed in 2 bands with one run directly along the waterfront edge and a second bunch in front of the flood walls. 

The plantings consist of a mix of grasses, shrubs, and young trees, functioning to absorb stormwater before it gets to the rest of the infrastructure, in addition to the beautification effect. This is a great combination of green and gray infrastructure at work, buffering between the East River and residential neighborhoods inland. 

One thing worth flagging-  upon closer look of the floodgates, I noticed that the tracks on which the gates are mounted appear to be paved over at the point where the gate would need to slide across the opening. The ground surface where the gate is meant to seal is covered in flush concrete or pavement, which would seem to obstruct the sliding mechanism. (see the yellow circle of one of the photos). Whether this reflects an incomplete installation, a design modification, or deferred functionality is unclear, but it raises questions about whether the gates are currently operable as intended. 

Several actors are responsible for this intervention. As it is along the East River Park, it would make most sense that NYC Parks are involved, along with the Mayor’s Office of Climate Resiliency, since this capital project cost close to $1.5 billion dollars. The most notable logo around the park/flood barrier is NYC Department of Design and Construction.